1
Written Project Scope
Document existing conditions, system criteria, deliverables, exclusions, schedule assumptions, and responsible parties
2
Professional Responsibility Review
Assign architect, engineer, code, accessibility, permit, submittal, and inspection responsibilities in writing where applicable
3
Fabrication
Confirm the exact system, dimensions, glass, finish, hardware, approvals, availability, and fabrication documents
4
Installation
Document access, protection, staging, business-disruption assumptions, testing, and acceptance criteria before installation